Inspection Record - Signatures and Service To

Inspection Record - Signatures and Service To

Purpose

To demonstrate how to set up and require signatures and add Service To to an Inspection Type.

Related Articles


Video



​Instructions




1. Click on Signatures.


Click on Signatures



2. Click on Occupancy Contact Signature.


Click on Occupancy Contact Signature



3. Click on the pen to have the Inspection Contact sign the Inspection Form.


Click on the pen to have the Inspection Contact sign the Inspection Form.



4. Contact sign and select Save.


Contact sign and select Save



5. Check Unable to sign if the Inspection Contact cannot sign and enter a reason unable to sign (required).


Check Unable to sign if the Inspection Contact cannot sign and enter a reason unable to sign (required).



6. Vendor Contact sign and Select Save.

  1. A Vendor Contact Signature will eliminate the requirement for an Occupancy Contact Signature.


Vendor Contact sign and Select Save



7. Inspector, click on Fill to sign with signature saved in profile.


Inspector, click on Fill to sign with signature saved in profile.



8. Optionally, Inspector to click on pen to sign.


Optionally, Inspector to click on pen to sign.



9. Sign and select Save.


Sign and select Save.



10. Inspection Signature Options: Navigate to Inspection Type to select Inspector Signature Requirements. Options are None, Sign or Fill, or Sign.





11. Select Inspection Complete by Options: Navigate to Inspection Type to select Completed Options. Options are Blank, Selectable User; Signed in User, not editable; and Signed in User, editable.





12. Contact Signature
  1. Check the box to make it required for this Inspection Type.
  2. If the box is checked, it will automatically check the Inspection Contact box since a signature is required.


Check the box to require an Occupancy Contact to sign the Inspection Record.



13. Inspection Contact
  1. If an Inspection Contact is required, check the box; otherwise, no Inspection Contact is needed for this Inspection Type.






14. If the Service To toggle is on for the Inspection Type, there will be a tab next to the Signatures tab.


If the Service To toggle is on for the Inspection Type, there will be a tab next to the Signatures tab.



15. Click on Service To tab.


Click on Service To tab.



16. Click on Add.


Click on Add



17. Fill in the information: Date and Name are required.





18. Choose from the dropdown which type of Relationship to Property (Required). Options are Director/Office of Corporation, Occupant - Named, Occupant - Other, Other, Owner - Named, or Owner - Other.





19. Choose from the dropdown for the Manner of Service (Required). Options are Certified Mail, Email, Fax, Other, Personal, Posted, or Regular Letter Mail.


Choose from the dropdown for the Manner of Service (Required). Options are Certified Mail, Email, Fax, Other, Personal, Posted, or Regular Letter Mail.



20. Put notes in the Notes section if needed.


Put notes in the Notes section if needed.



21. If Other for Relationship to Property is chosen then Other Reason for Relationship to Property (Required) box will populate and must be filled in.


If Other for Relationship to Property is chosen then Other Reason for Relationship to Property (Required) box will populate and must be filled in.



22. Click on Add.


Click on Add



23. The Service To will be able to be edited or deleted by using the icons in the Actions column.


The Service To will be able to be edited or deleted by using the icons in the Actions column.


    • Related Articles

    • Inspection Record - Inspection Clock

      Purpose To provide instructions on the Inspection Timer/Clock functions. Video Instructions 1. The Inspection Clock is activated by the Inspection Type with this slider. 2. Start Clock dialog window displayed when starting an Inspection. 3. Click on ...
    • Inspection Record - General Information

      Purpose To review the general information fields while recording an inspection. Related Articles: Remote Video Conference for Inspection Inspection Timer/Clock Managing Inspection Contacts Inspection Record - Linking Invoices and Permits Video ...
    • Completing an ePCR - Obtaining Signatures

      Purpose To demonstrate how to obtain appropriate signatures while completing an ePCR. Related Article EMS Setup - Signature Setup Video Directions 1. Navigate to the Signature section of an ePCR. 2. Click on Ellipsis and Edit to Add a signature to an ...
    • Resuming an Inspection

      Purpose To demonstrate how to resume an In Progress inspection. Video Instructions 1. Click on Inspections. 2. Click on Inspections List. 3. Click on Expand to expand advanced search. 4. Click on In Progress for Inspection Status. The user may desire ...
    • Inspection Record - Managing Inspection Contacts

      Purpose To review how to manage Inspection Contacts. Video Instructions 1. When recording an Inspection, Click on Contacts. Current contacts will be in the contacts list. Contacts are shared between Pre-Plans and Inspections. Note the contact ...