The Activities Log Daily Overview provides a calendar-based interface for viewing and managing all department activities and events for a specific day. This view displays activities in both chronological list format and traditional calendar layout, allowing users to efficiently review daily schedules, access activities directly from their source modules, and create new events as needed.
Background Information
The Activities Log Daily Overview serves as a comprehensive daily planning and activity management tool that consolidates activities from multiple First Due modules into a single-day calendar format. This view is particularly valuable for supervisors, dispatchers, and administrative personnel who need to understand daily department operations at a glance.
The system uses visual indicators to distinguish between current, past, and future dates, with the current date displayed with a manila-colored background while past and future dates appear with white backgrounds. Activities are presented in two formats: a chronological list showing all day's events in time order, and a traditional calendar grid that displays events based on their scheduled start and end times.
Required Permissions
Based on the system permissions structure, users need the following permissions to access and utilize the Activities Log Daily Overview:
Required for Basic Daily Overview Access:
Events > General > Events
Events > General > View Activities
Note: Users can only view and interact with activities from modules they have permission to access. The "Go to Item" functionality will only work for modules where the user has appropriate viewing or editing permissions.
Video
Step-by-Step Guide
Accessing the Activities Log Daily View
Navigate to the Events and Activities Module
From the main navigation menu, select "Events and Activities"
Select "Activities Log" from the module options
Switch to Daily View
Select the "Daily View" tab to access the calendar-based interface
Understanding Date Navigation and Visual Indicators
Identify Current Date
The current date is displayed with a manila-colored background
Past and future dates appear with white backgrounds
Navigate Between Dates
Calendar Method: Click the calendar icon and select any specific date or use the Calendar in the right side menu.
Arrow Navigation: Use the left and right arrows to move backward or forward one day at a time
Using Print and Export Functions
Access Print Options
Click the print icon in the interface
Choose which specific events to include in the printed view
The system will generate a PDF document with selected events
Filtering Events and Activities
Apply Event Filters
Use the filter options below the date navigation area
Filter events and activities to display only specific types or categories
This affects both the list view and calendar view simultaneously
Creating New Events
Create Event from Template
Select an event template that was previously created in the Events and Activity setup section
Templates provide pre-configured event structures for common activities
Create Unique Event
Click "Create Event" to build a new event from scratch
Configure event details, timing, and other parameters as needed
Viewing Daily Activities
Review Chronological List
View all day's events and activities in time order in the daily calendar area
Activities are listed sequentially based on their scheduled times
Use Traditional Calendar View
Review the same events in a standard calendar grid format
Events display based on their start and end times
All-day events appear at the top of the calendar view
Accessing Activities from Source Modules
Select Activities from List
Click on any activity in the chronological list to access it directly
The system will navigate to the source module for that activity
Use Calendar Eye Icon
Click the eye icon on events displayed in the calendar view
This provides the same direct access to the source module
Managing Event Actions
Select and Event
Select the Eye icon on an event.
Complete Event Checklist
Access and complete any checklist associated with the event (if configured)
Update Event Status
Mark events as complete when finished or update status based on event configuration requirements
Edit Event Details
Use "Go to Event" option to access full editing capabilities
Editing availability depends on user permissions and event configuration
Best Practices
Do's
Start each day by reviewing the Daily Overview to understand scheduled activities
Use the calendar icon for quick navigation to specific dates
Apply filters to focus on specific types of activities when the daily schedule is busy
Take advantage of the print function for offline daily schedule reference
Click directly on activities to access source modules for detailed information
Don'ts
Don't assume all activities are editable from the Daily Overview - use "Go to Item" for full editing capabilities
Don't overlook all-day events that appear at the top of the calendar view
Don't forget that only completed asset checks appear in the activities log
Don't attempt to edit events without proper permissions - contact administrators if access is needed
Tips & Recommendations
Use the manila background indicator to quickly identify the current date
Combine arrow navigation with calendar selection for efficient date browsing
Review both the chronological list and calendar view to get complete daily perspective
Use filters strategically during busy periods to focus on priority activities
Print daily schedules for field personnel who may not have constant system access
Set up event templates for recurring activities to streamline daily event creation
Troubleshooting & FAQs
Q: I can't tell which date is today because I don't see the manila background color. What's wrong? A: The manila background color indicates the current date and depends on your system date settings. Ensure your computer's date and time are correct and try refreshing your browser. If the current date still doesn't show the manila background, contact your system administrator.
Q: When I click on an activity in the chronological list, nothing happens or I get an error. Why? A: This usually indicates a permissions issue. You can only access activities from modules you have permission to view. For example, if you click on a training activity but lack training module permissions, the system can't take you to that module. Contact your administrator about the necessary permissions.
Q: I don't see any activities for certain dates even though I know events are scheduled. What's the issue? A: Check if filters are applied that might be hiding activities. Also, ensure you have the proper permissions for the modules where those activities originate. For example, if scheduled inspections don't appear, you may need Fire Prevention permissions.
Q: The print function creates a PDF but it doesn't include all the events I can see on screen. Why not? A: The print function allows you to select which specific events to include in the PDF. Make sure you've selected all the events you want to print before generating the PDF. Only checked/selected events will appear in the printed document.
Q: Why do I only see completed asset checks but not scheduled ones in the daily view? A: This is normal system behavior. The Activities Log only displays completed asset checks and apparatus checks, not scheduled future checks. Scheduled checks would appear in other modules or calendar views until they're completed and then show in the Activities Log.
Q: I can navigate to other dates but can't create events on past dates. Is this a system limitation? A: While you can view past dates and their activities, event creation is typically restricted to current and future dates depending on your system configuration and permissions. This prevents accidental backdating of events. Contact your administrator if you need to create events for past dates for legitimate reasons.
Purpose Statement The Daily Log provides a centralized system for recording and tracking routine activities at fire stations and departmental sections. This feature enables comprehensive documentation of daily operations including physical fitness ...
Purpose Statement The Daily Log List provides a condensed, comprehensive view of all daily log entries within the department, enabling efficient review, search, and analysis of operational activities through a streamlined interface. This ...
Purpose Statement The Daily Log History provides a comprehensive audit trail and detailed view of all daily log entries entered into the First Due system, including complete change history for tracking edits, modifications, and updates to each entry. ...
Purpose Statement This guide provides a comprehensive overview of all available locations for creating events within the Events and Activities module. Understanding the multiple event creation access points enables users to efficiently create events ...
Purpose Statement The Activities Log List view provides a centralized interface for viewing, searching, and managing all activities and events across multiple modules within the First Due system. This comprehensive overview enables users to ...