The purpose of this Knowledge Base Article is to demonstrate how to re-open a Completed Inspection and what actions can be performed.
Video
Instructions
1. Permission needed to re-open an Inspection.
2. Click on Inspections.
3. Click on Inspections List.
Completed Inspections on the My Inspections page can also be reopened.
4. Click on Re-Open. Requirements to re-open an inspection or re-inspection:
The inspection must be Completed.
No Completed, Ready for Review, or In Progress re-inspections are associated with the selected inspection. If this happens, the user must delete all re-inspections after the selected one.
If there are any future re-inspections that are canceled or scheduled, the system will delete them (the user must confirm this).
5. Warning modal if conditions listed in previous step are not met.
6. Enter a reason for re-opening the selected Inspection and then select "Re-Open."
7. If using the Inspection Timer, select confirm to mark the user on-site, Cancel to mark the user not on-site.
8. Re-opened Inspection.
The completed inspection will be archived, and a new one will be created to keep track of the changes and revert if needed (this must be done by support).
Only the most recent Inspection will be shown in the lists and reports.
Once the inspection is reopened, it will return to the In Progress status, and an indicator RE-OPEN is shown at the top of the page.
9. The user will be limited to changing the following items:
Checklist items
Attachments
Inspection Type
Schedule Type
Scheduled At Date
Scheduled at Time
Completed at Date (will be original Completed at Date)
Completed at Time (Will be original Completed at Time)
Shift
Assigned to
Fire Station
Notes
Signature
NOTE: INSPECTION CONTACT, OCCUPANCY AND PRE-PLAN INFORMATION IS RESTRICTED FROM BEING UPDATED IN A RE-OPENED INSPECTION.
10. Click on Complete when done with changes.
11. Click on Close.
12. If the Inspection is saved after re-opened, returning to the Inspections List will allow the user to utilize actions.
Purpose To explain the the "Resolved" response for inspection checklist items. Background "Resolved" is a response that can ONLY be used during a follow up inspection or re-inspection. IMPORTANT: "Resolved" is intended to verify a previous issue ...
Purpose To explain the Inspections Count by Type and Status report. How is this report helpful? This report displays the number of Inspections your agency has conducted and their current status. This report displays the violation data associated with ...
Purpose To demonstrate navigating and using the My Inspections page. Video Instructions 1. Click on Inspections. 2. Click on My Inspections. For Inspections to be viewed on the My Inspections page, the inspections have to be assigned to the signed in ...
Purpose The purpose of this Knowledge Base Article is to demonstrate how to update a Completed Permit Video Instructions 1. Click on Edit to edit to update an "Completed" Permit. 2. Option #1 - Completed Permit - Click on Reopening Submitted. 3. ...
Purpose The purpose of this Knowledge Base Article is to review the layout, perform operations, and how to use filters in the Inspections List. Related Articles Inspections Map Sending Inspection Reminder Offline Inspections Re-Open Completed ...